Planning allowances
Borehole drilling cost is more than metres × rate.
Hamiki’s published starting guides are KSh 45,000 for a hydrogeological survey and KSh 6,500 per metre for suitable drilling conditions. Final scope follows the survey, geology and borehole design.
Quick planning calculator
Build a first-pass drilling allowance.
What changes the figure
- Geology and drilling method
Competent rock and loose formations require different methods and consumables. - Casing and screen design
Diameter, casing depth, material and aquifer intervals alter the construction cost. - Mobilisation and access
Distance, road condition, working space, water supply and security affect logistics. - Completion scope
Development, testing, water analysis, pump, power, storage and distribution are separate from drilling metres.
Typical cost structure
Ask every contractor what the rate includes.
A low per-metre number can exclude essential construction or completion items. Compare written scopes, not only headline prices.
| Component | Pricing basis | Planning note |
|---|---|---|
| Hydrogeological survey | Per site | Hamiki guide starts from KSh 45,000 |
| Drilling | Per drilled metre | Air drilling guide starts from KSh 6,500/m |
| Mud drilling | Per drilled metre | Published guide KSh 14,050/m for loose formations |
| Casing and screens | Metres and specification | Confirm diameter, material and installed length |
| Development and test pumping | Time / agreed scope | Required to understand performance |
| Pump and controls | Duty and equipment | Select after yield and head are known |
| Solar and storage | System design | Depends on daily demand and autonomy |
